to strengthen the floor paving method: suspended laying strengthen the use of suspended floor laying, the laying of floating method is not directly fixed on the ground floor, usually on the ground to find after level, covered with moisture-proof pad, then directly above the floor is laid. The first step: to deal with the ground floor pavement to strengthen the floor, you need to ensure that the ground level and dry.
The ground floor rate needs to be up to standard, the rough room floor generally do cement ground leveling. The moisture content of the ground should also pay attention to, if the moisture content is too high, need to do moistureproof treatment. The second step: laying the ground mat cushion is moisture-proof,
mute. In the laying of the floor before the strengthening of the ground floor pad. General pad placement to smooth without overlapping covered the entire laying on the ground, the joint application of adhesive tape tightly. The ground and wet geothermal environment should be the lower pad fortify wet film, the width of joints shall be above 200mm and overlap with adhesive tape tightly, the corner turned up with the same baseboard height.
Best WPC Supplier | Composite Deck | Seven Trust
prefab pool decks for sale
exterior paneling south africa
2 x 6 tongue and groove decking
ground should also pay attention wpc floor
Moderators: mgmirkin, Moderators
-
- Neophyte
- Posts: 21
- Joined: Mon Nov 07, 2016 2:18 am